Designing

The majority of our projects was performed in the turnkey system, including the designing phase. Below, we present a few selected topics.

  • design and performance of dust reduction installation and the Coal Feed Dept. TN 4A and 4B at EC “Kraków” S.A.
  • design and performance of biomass feed and measurement installation with capacity of up to 50 t/h, design and performance of vibrating grate and DUSTEX dust reduction installation at El. Skawina S.A.
  • design and performance of spatial dedusting installation at ZPW KWK “Borynia” Jastrzębska Spółka Węglowa
  • design and assembly of biomass dusting reduction installation at conveyor belt dumps – PKE S.A. Elektrownia Łaziska
  • design and performance of technological node modernisation at Building 12 for the purpose of limiting dusting using DUSTEX system at PGE Elektrownia Opole S.A.
  • design and assembly of biomass feed and measurement installation for EC Kraków S.A.
  • design and assembly of biomass feed and measurement installation for ELCHO Chorzów Sp. z o.o.
  • design and performance of biomass feed and measurement installation for EC Będzin S.A.
  • design and performance of biomass co-incineration installation at PGE El. Turów S.A.
  • design and performance of biomass co-incineration installation for Vattenfall Heat Poland S.A at EC Siekierki Warszawa